The three jaw positioning mechanism, the vibration assembly machine and the steel foot positioning fixtures ensure the coaxality of the insulator fittings. The finished insulator is maintained at 60 C -70 C hot pool. After the completion of the maintenance, the 50% tensile load test is carried out according to the technological requirements, and the strength of the insulation structure is automatically checked.